Qu Edmonton EDM1
Qu Edmonton EDM1 is an operational data center operated by Qu in Edmonton, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Qu |
| Address | 102 Avenue NW 10200, T5J 4B7, Edmonton |
| Coordinates | 53.54341, -113.49599 |
Power and grid
| Utility | Epcor Utilities (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 3.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.8 °C (2001 to 2025) |
| Cooling degree days | 50 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.51 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Medium - High (20-40%) (Alberta) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Qu Edmonton EDM1?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Qu Edmonton EDM1?
Qu.
Data centers near Edmonton
Sources
Correct this page or get the data