Sturgeon Data Centre
Sturgeon Data Centre is a data center under construction operated by Meta in Fort Saskatchewan, Canada. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Under construction |
|---|---|
| Operator | Meta |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| Address | Range Road 223 56111 |
| Coordinates | 53.82450, -113.19873 |
Power and grid
| Nearest high-voltage substation | Heathfield Converter Station, 500 kV, 3 km away (ATCO Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 15 |
| Utility | Fortisalberta (investor owned) Electric retail service territory (HIFLD, US government). |
| Power plants within 50 km | 455 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 2.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 48 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.33 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Medium - High (20-40%) (Alberta) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Sturgeon Data Centre use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How close is Sturgeon Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Heathfield Converter Station (500 kV), about 3 km away. The local utility is Fortisalberta.
How clean is the power for Sturgeon Data Centre?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Sturgeon Data Centre?
Meta.
Data centers near Fort Saskatchewan
- Beacon Heartland AI Data Center Hub 1.9 km
- ThinkTel Communications Edmonton 36.8 km
- Qu Edmonton EDM1 36.9 km
- Wolfpaw Edmonton 1 37.0 km
- 4WEB Edmonton Data Centre 37.3 km
- Associated Engineering Plaza (10909 Jasper Avenue) 37.6 km
- The Internet Centre Inc 42.7 km
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.