Quantum Switch DMM B
Quantum Switch DMM B is an operational data center operated by Quantum Switch in Dammam, Saudi Arabia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Quantum Switch |
| Address | 6968 Al Dammam, 1140 (27th Street) |
| Coordinates | 26.25360, 49.98920 |
| Website | qstdc.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 1.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 1.9 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 8.6 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 676 g CO₂ per kWh (Saudi Arabia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 63.3%, oil and other fossil 31.9%, solar 4.5%. Clean power: 4.8% |
Climate and water
| Average temperature | 27.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 47 °C (2001 to 2025) |
| Cooling degree days | 3,564 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.25 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Extremely High (>80%) (Saudi Arabia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Quantum Switch DMM B to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1.1 km away.
How clean is the power for Quantum Switch DMM B?
The grid in Saudi Arabia emits about 676 g CO₂ per kWh (2025). Largest sources: gas 63.3%, oil and other fossil 31.9%, solar 4.5%.
Who operates Quantum Switch DMM B?
Quantum Switch.
Data centers near Dammam
- Aramco Groq Inference Cluster 22.9 km · 8.5 MW
- Global Zone 44.2 km
- Amazon Web Services 49.6 km · 17 MW
- Batelco Hamala Data Center 49.6 km · 5.6 MW
More Quantum Switch data centers
- Quantum Switch DMM A Saudi Arabia
- Quantum Switch DOA A Qatar
- Quantum Switch DOA B Qatar
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.