Raxio CIV1
Raxio CIV1 is an operational data center operated by Raxio in Grand-Bassam, Côte d’Ivoire. Our footprint estimate of its power is about 4.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Raxio |
| Facility power | 4.4 MW (range 2.2 MW to 7.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,698 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 5.22771, -3.75915 |
| Website | raxiogroup.com/locations/ivory-coast |
Power and grid
| Nearest high-voltage substation | Poste de bingerville, 225 kV, 13.2 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Power plants within 50 km | 1.3 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 398 g CO₂ per kWh (Côte d’Ivoire, 2024) Average of all power made in the area. Ember. |
| Grid power mix | gas 69.5%, hydro 27.2%, solar 2.2%, bioenergy 0.9%. Clean power: 30.4% |
Climate and water
| Average temperature | 26.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.8 °C (2001 to 2025) |
| Cooling degree days | 3,085 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.58 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | Low (<10%) (Côte d’Ivoire) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Raxio CIV1 use?
We estimate the facility power at about 4.4 MW. Estimate from building footprint, low confidence.
How close is Raxio CIV1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste de bingerville (225 kV), about 13.2 km away.
How clean is the power for Raxio CIV1?
The grid in Côte d’Ivoire emits about 398 g CO₂ per kWh (2024). Largest sources: gas 69.5%, hydro 27.2%, solar 2.2%.
Who operates Raxio CIV1?
Raxio.
Data centers near Grand-Bassam
- Equinix AB1 - Abidjan 330 m
- PAIX Abidjan 27.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.