Raxio CIV1 is an operational data center operated by Raxio in Grand-Bassam, Côte d’Ivoire. Our footprint estimate of its power is about 4.4 MW.

Key facts

StatusOperational
OperatorRaxio
Facility power4.4 MW (range 2.2 MW to 7.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,698 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates5.22771, -3.75915
Websiteraxiogroup.com/locations/ivory-coast

Power and grid

Nearest high-voltage substationPoste de bingerville, 225 kV, 13.2 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km1.3 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity398 g CO₂ per kWh (Côte d’Ivoire, 2024)
Average of all power made in the area. Ember.
Grid power mixgas 69.5%, hydro 27.2%, solar 2.2%, bioenergy 0.9%. Clean power: 30.4%

Climate and water

Average temperature26.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.8 °C (2001 to 2025)
Cooling degree days3,085 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.58 kWh per m² per day
Wind at 50 m4.9 m/s average
Water stress todayLow (<10%) (Côte d’Ivoire)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Raxio CIV1 use?

We estimate the facility power at about 4.4 MW. Estimate from building footprint, low confidence.

How close is Raxio CIV1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste de bingerville (225 kV), about 13.2 km away.

How clean is the power for Raxio CIV1?

The grid in Côte d’Ivoire emits about 398 g CO₂ per kWh (2024). Largest sources: gas 69.5%, hydro 27.2%, solar 2.2%.

Who operates Raxio CIV1?

Raxio.

Data centers near Grand-Bassam

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.