Equinix AB1 - Abidjan
Equinix AB1 - Abidjan is an operational data center operated by Equinix in Grand Bassam, Côte d’Ivoire. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 10 networks PeeringDB. |
| Also known as | Raxio, CIV1, Abidjan, Côte d’Ivoire · Datacenter service Abidjan CIV01 |
| Address | Parc Technologique du VITIB – Zone Franche |
| Coordinates | 5.23035, -3.75778 |
| Website | equinix.com/data-centers/europe-colocation/cote-divoire-colocation/abidjan-data-centers/ab1 |
Power and grid
| Nearest high-voltage substation | Poste de bingerville, 225 kV, 13 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Power plants within 50 km | 1.3 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 398 g CO₂ per kWh (Côte d’Ivoire, 2024) Average of all power made in the area. Ember. |
| Grid power mix | gas 69.5%, hydro 27.2%, solar 2.2%, bioenergy 0.9%. Clean power: 30.4% |
Climate and water
| Average temperature | 26.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.8 °C (2001 to 2025) |
| Cooling degree days | 3,085 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.58 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | Low (<10%) (Côte d’Ivoire) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix AB1 - Abidjan to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste de bingerville (225 kV), about 13 km away.
How clean is the power for Equinix AB1 - Abidjan?
The grid in Côte d’Ivoire emits about 398 g CO₂ per kWh (2024). Largest sources: gas 69.5%, hydro 27.2%, solar 2.2%.
Who operates Equinix AB1 - Abidjan?
Equinix.
Data centers near Grand Bassam
- Raxio CIV1 330 m · 4.4 MW
- PAIX Abidjan 27.6 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.