Raxio UG1

Raxio UG1 is an operational data center in Bweyogerere, Uganda. Our footprint estimate of its power is about 3.9 MW.

Key facts

StatusOperational
Facility power3.9 MW (range 1.9 MW to 6.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,232 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates0.34701, 32.68973
Websiteraxiogroup.com/locations/uganda

Power and grid

Nearest high-voltage substationNamanve substation, 132 kV, 3.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationKawanda substation, 400 kV, 18.2 km away
HV substations within 10 km1
Power plants within 50 km75 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity58 g CO₂ per kWh (Uganda, 2024)
Average of all power made in the area. Ember.
Grid power mixhydro 82.9%, bioenergy 7.8%, solar 6.5%, oil and other fossil 2.8%. Clean power: 97.2%

Climate and water

Average temperature22.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.9 °C (2001 to 2025)
Cooling degree days1,668 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.34 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayLow (<10%) (Uganda)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Raxio UG1 use?

We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.

How close is Raxio UG1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Namanve substation (132 kV), about 3.9 km away.

How clean is the power for Raxio UG1?

The grid in Uganda emits about 58 g CO₂ per kWh (2024). Largest sources: hydro 82.9%, bioenergy 7.8%, solar 6.5%.