Raxio, UG1, Kampala, Uganda

Raxio, UG1, Kampala, Uganda is an operational data center operated by RAXIO DATA CENTRES in Kampala, Uganda. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorRAXIO DATA CENTRES
Networks14 networks, 1 internet exchanges
PeeringDB.
AddressPlot 781, Block 113, Namanve Industrial Park
Coordinates0.35807, 32.69414
Websiteraxiogroup.com/locations/uganda

Power and grid

Nearest high-voltage substationNamanve substation, 132 kV, 3 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationKawanda substation, 400 kV, 18.2 km away
HV substations within 10 km1
Power plants within 50 km75 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity58 g CO₂ per kWh (Uganda, 2024)
Average of all power made in the area. Ember.
Grid power mixhydro 82.9%, bioenergy 7.8%, solar 6.5%, oil and other fossil 2.8%. Clean power: 97.2%

Climate and water

Average temperature22.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.9 °C (2001 to 2025)
Cooling degree days1,668 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.34 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayLow (<10%) (Uganda)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is Raxio, UG1, Kampala, Uganda to the power grid?

The nearest high-voltage substation in OpenStreetMap is Namanve substation (132 kV), about 3 km away.

How clean is the power for Raxio, UG1, Kampala, Uganda?

The grid in Uganda emits about 58 g CO₂ per kWh (2024). Largest sources: hydro 82.9%, bioenergy 7.8%, solar 6.5%.

Who operates Raxio, UG1, Kampala, Uganda?

RAXIO DATA CENTRES.

Data centers near Kampala

More RAXIO DATA CENTRES data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.