Redcentric Harrogate Data Centre
Redcentric Harrogate Data Centre is an operational data center operated by Redcentric in Harrogate, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Redcentric |
| Address | Beckwith Knowle |
| Coordinates | 53.97887, -1.56707 |
| Website | redcentricplc.com/uk-data-centres/harrogate-data-centre |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.9 °C (2001 to 2025) |
| Cooling degree days | 10 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.62 kWh per m² per day |
| Wind at 50 m | 7.3 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Redcentric Harrogate Data Centre?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Redcentric Harrogate Data Centre?
Redcentric.
Data centers near Harrogate
- VocaLink 362 m · 1.8 MW
- DC14-Leeds 18.3 km
- aql DC2 20.7 km
- aql DC5 21.6 km
- GridJet 21.8 km · 1 MW
- Templus DC Leeds LEE01 22.2 km
- Legend Bradford 24.1 km
- Bytemark YO26 DC1 28.5 km
More Redcentric data centers
- Redcentric Elland Data Centre United Kingdom
- Redcentric Reading United Kingdom
- Redcentric London Data Centre United Kingdom
- Elland DC United Kingdom
- Redcentric Cambridge United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.