Redcentric Elland Data Centre
Redcentric Elland Data Centre is an operational data center operated by Redcentric in Elland, United Kingdom. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Redcentric |
| Facility power | 14 MW (range 7 MW to 22 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,830 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Lowfields Way, HX5 9DA, Elland |
| Coordinates | 53.69389, -1.82142 |
| Website | redcentricplc.com/uk-data-centres/elland-data-centre |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 8.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.7 °C (2001 to 2025) |
| Cooling degree days | 7 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.73 kWh per m² per day |
| Wind at 50 m | 7.3 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Redcentric Elland Data Centre use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How clean is the power for Redcentric Elland Data Centre?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Redcentric Elland Data Centre?
Redcentric.
Data centers near Elland
- Sungard AS Elland TC4 73 m
- Elland DC 475 m
- Lloyds Banking Group Copley 4.5 km · 32 MW
- Legend Bradford 11.9 km
- Templus DC Leeds LEE01 18.3 km
- GridJet 19.1 km · 1 MW
- aql DC5 20.9 km
- aql DC2 21.5 km
More Redcentric data centers
- Redcentric Reading United Kingdom
- Redcentric London Data Centre United Kingdom
- Elland DC United Kingdom
- Redcentric Cambridge United Kingdom
- Redcentric Harrogate Data Centre United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.