Sungard AS Elland TC4
Sungard AS Elland TC4 is an operational data center operated by Sungard Availability Services in Elland, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Sungard Availability Services |
| Networks | 1 networks PeeringDB. |
| Address | Unit J1, Lowfields Business Park, Lowfields Way |
| Coordinates | 53.69329, -1.82186 |
| Website | sungardas.com/en-gb/facilities/europe/united-kingdom/elland-tc4-data-centre-and-workplace-recovery-centre |
Power and grid
| Nearest high-voltage substation | Elland Substation, 275 kV, 100 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 2.7 GW in 67 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 8.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.7 °C (2001 to 2025) |
| Cooling degree days | 7 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.73 kWh per m² per day |
| Wind at 50 m | 7.3 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Sungard AS Elland TC4 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Elland Substation (275 kV), about 100 m away.
How clean is the power for Sungard AS Elland TC4?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Sungard AS Elland TC4?
Sungard Availability Services.
Data centers near Elland
- Redcentric Elland Data Centre 73 m · 14 MW
- Elland DC 475 m
- Lloyds Banking Group Copley 4.5 km · 32 MW
- Legend Bradford 12.0 km
- Templus DC Leeds LEE01 18.4 km
- GridJet 19.1 km · 1 MW
- aql DC5 20.9 km
- aql DC2 21.6 km
More Sungard Availability Services data centers
- Sungard AS Aurora United States
- Sungard AS Carlstadt 777 United States
- Sungard AS London Technology Centre United Kingdom
- Sungard AS Sacramento United States
- Sungard AS Scottsdale United States
- Sungard AS Thornton United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.