Scala Data Center is an operational data center operated by Scala in Carapicuíba, Brazil. Our footprint estimate of its power is about 56 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Scala |
| Facility power | 56 MW (range 28 MW to 89 MW) Estimate from building footprint, low confidence. Footprint estimate: about 46,432 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 24,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Scala Datacenter |
| Coordinates | -23.49674, -46.81500 |
Power and grid
| Nearest high-voltage substation | Subestação Anhangüera, 345 kV, 4.8 km away (CTEEP) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 669 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 19.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.6 °C (2001 to 2025) |
| Cooling degree days | 955 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.53 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Low - Medium (10-20%) (Brazil) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Scala Data Center use?
We estimate the facility power at about 56 MW. Estimate from building footprint, low confidence.
How close is Scala Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Anhangüera (345 kV), about 4.8 km away.
How clean is the power for Scala Data Center?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Scala Data Center?
Scala.
Data centers near Carapicuíba
- B-BRIX - SPO1 62 m
- Equinix SP4 - São Paulo 104 m · 1.9 MW
- Scala Data Centers SGRUTB04 191 m
- Scala Data Centers SGRUTB01 425 m
- Scala Data Centers SGRUTB03 585 m · 17 MW
- Equinix SP4 Terremark 641 m
- Equinix SP2 - São Paulo 1.4 km
- Omid Solutions Barueri 2.1 km
More Scala data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.