ScaleMatrix Jacksonville Data Center US-South 02

ScaleMatrix Jacksonville Data Center US-South 02 is an operational data center operated by ScaleMatrix in Jacksonville, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorScaleMatrix
Address8324 Baymeadows Way
Coordinates30.21645, -81.58209
Websitescalematrix.com/jacksonville-data-center

Power and grid

Nearest high-voltage substationSouthpoint Substation JEA, 138 kV, 2.1 km away (Jacksonville Electric Authority)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationHartley Substation JEA, 230 kV, 4.5 km away
HV substations within 10 km13
UtilityBeaches Energy Services (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityFPL
Nearest gas pipelineFlorida Gas Trans Co, interstate pipeline, 12 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.3 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity436 g CO₂ per kWh (Florida, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6%
Industrial power priceUSD 0.089 per kWh (Florida, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature21.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.6 °C (2001 to 2025)
Cooling degree days1,730 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.79 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayHigh (40-80%) (Florida)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is ScaleMatrix Jacksonville Data Center US-South 02 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Southpoint Substation JEA (138 kV), about 2.1 km away. The local utility is Beaches Energy Services, in the FPL balancing area.

How clean is the power for ScaleMatrix Jacksonville Data Center US-South 02?

The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.

Who operates ScaleMatrix Jacksonville Data Center US-South 02?

ScaleMatrix.

Data centers near Jacksonville

More ScaleMatrix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.