EdgeConneX Jacksonville (EDCJAX01)

EdgeConneX Jacksonville (EDCJAX01) is an operational data center operated by EdgeConneX in Jacksonville, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorEdgeConneX
Networks6 networks
PeeringDB.
Address6602 Executive Park Court N, Unit 105
Coordinates30.25424, -81.60418
Websiteedgeconnex.com

Power and grid

Nearest high-voltage substationPowers Substation JEA, 138 kV, 1.6 km away (Jacksonville Electric Authority)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationForest Substation JEA, 230 kV, 6.5 km away
HV substations within 10 km9
UtilityBeaches Energy Services (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityFPL
Nearest gas pipelineFlorida Gas Trans Co, interstate pipeline, 7.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.4 GW in 19 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity436 g CO₂ per kWh (Florida, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6%
Industrial power priceUSD 0.089 per kWh (Florida, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature21.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.6 °C (2001 to 2025)
Cooling degree days1,641 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.79 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayHigh (40-80%) (Florida)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is EdgeConneX Jacksonville (EDCJAX01) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Powers Substation JEA (138 kV), about 1.6 km away. The local utility is Beaches Energy Services, in the FPL balancing area.

How clean is the power for EdgeConneX Jacksonville (EDCJAX01)?

The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.

Who operates EdgeConneX Jacksonville (EDCJAX01)?

EdgeConneX.

Data centers near Jacksonville

More EdgeConneX data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.