Studio Delta Srl
Studio Delta Srl is an operational data center in Reggio nell'Emilia, Italy. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Coordinates | 44.69373, 10.64682 |
Power and grid
| Nearest high-voltage substation | Reggio Nord, 132 kV, 2.7 km away (e-distribuzione S.p.A.) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Rubiera, 380 kV, 12.6 km away |
| HV substations within 10 km | 5 |
| Power plants within 50 km | 350 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 596 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Medium - High (20-40%) (Emilia-Romagna) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Studio Delta Srl to the power grid?
The nearest high-voltage substation in OpenStreetMap is Reggio Nord (132 kV), about 2.7 km away.
How clean is the power for Studio Delta Srl?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Data centers near Reggio nell'Emilia
- Tecnodati (S.R.L.) 1.9 km
- iZOOM.it 1.9 km
- Data Center 23.0 km · 2.6 MW
- Comeser Parma 48.4 km
- Bitviking 51.8 km
- Leonardo (supercomputer) 53.7 km
- EuroHPC Leonardo 58.0 km · 13 MW
- Ehiweb.it Bologna 58.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.