Switch Datacenters AMS4 is an operational data center operated by Switch Datacenters in Diemen, Netherlands. Our footprint estimate of its power is about 5.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Switch Datacenters |
| Facility power | 5.4 MW (range 2.7 MW to 8.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,509 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 2023 |
| Coordinates | 52.33151, 4.97360 |
Power and grid
| Nearest high-voltage substation | 150 kV Venserweg, 150 kV, 600 m away (TenneT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Diemen, 380 kV, 2.8 km away |
| HV substations within 10 km | 19 |
| Power plants within 50 km | 3.9 GW in 62 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.1 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Netherlands) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Switch Datacenters AMS4 use?
We estimate the facility power at about 5.4 MW. Estimate from building footprint, low confidence.
How close is Switch Datacenters AMS4 to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150 kV Venserweg (150 kV), about 600 m away.
How clean is the power for Switch Datacenters AMS4?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates Switch Datacenters AMS4?
Switch Datacenters.
Data centers near Diemen
- Equinix AM6 - Amsterdam, Duivendrechtsekade 2.7 km
- Global Crossing Joop 2.7 km
- Equinix AM3 - Amsterdam, Science Park 2.8 km · 75 MW
- Equinix data center in Amsterdam-Oost 2.9 km · 8.5 MW
- IPTP, Matrix 4, Amsterdam, The Netherlands 3.0 km
- Digital Realty AMS17 - Amsterdam 3.1 km