System-Net HDC 1
System-Net HDC 1 is an operational data center operated by System-Net in Saint Aunes, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | System-Net |
| Networks | 2 networks PeeringDB. |
| Address | 125 rue de la sariette |
| Coordinates | 43.64844, 3.97095 |
| Website | system-net.fr |
Power and grid
| Nearest high-voltage substation | Poste électrique de Saumade, 225 kV, 6.7 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 121 MW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 595 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.41 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Occitanie) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is System-Net HDC 1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Saumade (225 kV), about 6.7 km away.
How clean is the power for System-Net HDC 1?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates System-Net HDC 1?
System-Net.
Data centers near Saint Aunes
- Datacenter France Travail 5.5 km · 2.3 MW
- Data center in Montpellier 5.9 km · 2.7 MW
- Cogent Montpellier 8.0 km
- GENCI Adastra 8.7 km · 1.6 MW
- UltraEdge Montpellier 10.1 km
- Cogent Montpellier 10.2 km · 1.3 MW
- CINES 10.4 km · 6 MW
- Montpellier Internet Telecom Datacenter 10.7 km · 0.6 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.