T-Mobile data center in Staré Strašnice
T-Mobile data center in Staré Strašnice is an operational data center operated by T-Mobile in Staré Strašnice, Czechia. Our footprint estimate of its power is about 3.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | T-Mobile |
| Facility power | 3.5 MW (range 1.4 MW to 8.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 29,464 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Datové centrum DC7 |
| Opened | 2018-03-31 |
| Coordinates | 50.06451, 14.52828 |
Power and grid
| Nearest high-voltage substation | Rozvodna Malešice, 220 kV, 2.2 km away (ČEPS;PRE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 17 |
| Power plants within 50 km | 1.8 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 401 g CO₂ per kWh (Czechia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 42.3%, coal 35.2%, bioenergy 8%, solar 5.8%, gas 5.4%. Clean power: 59.2% |
| Industrial power price | EUR 0.154 per kWh (Czechia, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 181 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 6 m/s average |
| Water stress today | Low (<10%) (Prague) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does T-Mobile data center in Staré Strašnice use?
We estimate the facility power at about 3.5 MW. Estimate from building footprint, low confidence.
How close is T-Mobile data center in Staré Strašnice to the power grid?
The nearest high-voltage substation in OpenStreetMap is Rozvodna Malešice (220 kV), about 2.2 km away.
How clean is the power for T-Mobile data center in Staré Strašnice?
The grid in Czechia emits about 401 g CO₂ per kWh (2025). Largest sources: nuclear 42.3%, coal 35.2%, bioenergy 8%.
Who operates T-Mobile data center in Staré Strašnice?
T-Mobile.
Data centers near Staré Strašnice
- T-Mobile CZ DC7 307 m
- VSHosting ServerPark DC1 465 m
- VSHosting s.r.o 506 m
- TTC TELEPORT DC2 1.8 km · 3.9 MW
- TTC TELEPORT DC1 2.0 km · 12 MW
- CE Colo Prague 3.3 km · 4.5 MW
- Connect plus s.r.o. 3.5 km
- GTS Telehouse Prague 4.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.