Data Center Directory

TTC TELEPORT DC2

TTC TELEPORT DC2 is an operational data center operated by TTC Teleport s.r.o. in Prague, Czechia. Our footprint estimate of its power is about 3.9 MW.

Key facts

StatusOperational
OperatorTTC Teleport s.r.o.
Facility power3.9 MW (range 2 MW to 6.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,288 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks31 networks, 3 internet exchanges
PeeringDB.
Also known asDCXV Czechia · TTC TELEPORT - DC2
AddressSazecska 10
Coordinates50.08050, 14.52134
Websitettc-teleport.cz

Power and grid

Nearest high-voltage substationRozvodna Malešice, 220 kV, 700 m away (ČEPS;PRE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km16
Power plants within 50 km1.8 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity401 g CO₂ per kWh (Czechia, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 42.3%, coal 35.2%, bioenergy 8%, solar 5.8%, gas 5.4%. Clean power: 59.2%
Industrial power priceEUR 0.154 per kWh (Czechia, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days181 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.97 kWh per m² per day
Wind at 50 m6 m/s average
Water stress todayLow (<10%) (Prague)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does TTC TELEPORT DC2 use?

We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.

How close is TTC TELEPORT DC2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Rozvodna Malešice (220 kV), about 700 m away.

How clean is the power for TTC TELEPORT DC2?

The grid in Czechia emits about 401 g CO₂ per kWh (2025). Largest sources: nuclear 42.3%, coal 35.2%, bioenergy 8%.

Who operates TTC TELEPORT DC2?

TTC Teleport s.r.o..

Data centers near Prague

More TTC Teleport s.r.o. data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.