T-Systems Biere Rechenzentrum is an operational data center operated by Deutsche Telekom in Schönebeck, Germany. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorDeutsche Telekom
Facility power11 MW (range 4.5 MW to 28 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 94,757 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.98484, 11.65391
Websitet-systems.com/de/en/about-t-systems/innovation-management/data-center-biere

Power and grid

Nearest high-voltage substationBiere T-Systems, 110 kV, 200 m away (Avacon Netz)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUmspannwerk Förderstedt, 380 kV, 8.5 km away
HV substations within 10 km8
Power plants within 50 km766 MW in 47 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.2 °C (2001 to 2025)
Cooling degree days137 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.9 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does T-Systems Biere Rechenzentrum use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is T-Systems Biere Rechenzentrum to the power grid?

The nearest high-voltage substation in OpenStreetMap is Biere T-Systems (110 kV), about 200 m away.

How clean is the power for T-Systems Biere Rechenzentrum?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates T-Systems Biere Rechenzentrum?

Deutsche Telekom.

Data centers near Schönebeck

More Deutsche Telekom data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.