WKNJ00 is an operational data center operated by Deutsche Telekom in Waldkirchen, Germany. Our footprint estimate of its power is about 1.9 MW.

Key facts

StatusOperational
OperatorDeutsche Telekom
Facility power1.9 MW (range 0.9 MW to 3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,558 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 810 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressFreyunger Straße 10, 94065, Waldkirchen
Coordinates48.73418, 13.60339

Power and grid

Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does WKNJ00 use?

We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.

How clean is the power for WKNJ00?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates WKNJ00?

Deutsche Telekom.