T2 Ljubljana Brnciceva
T2 Ljubljana Brnciceva is an operational data center operated by T-2 d.o.o. in Črnuče, Slovenia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | T-2 d.o.o. |
| Networks | 1 networks PeeringDB. |
| Address | Brnčičeva ulica 41A |
| Coordinates | 46.09496, 14.55381 |
| Website | t-2.net/gostovanje-kolokacije |
Power and grid
| Nearest high-voltage substation | RTP Žale, 110 kV, 3.8 km away (Elektro Ljubljana) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | RTP Beričevo, 400 kV, 4.6 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 1.3 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 183 g CO₂ per kWh (Slovenia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.3%, hydro 27.5%, coal 14.7%, solar 10.1%, gas 6.4%. Clean power: 78.9% |
| Industrial power price | EUR 0.130 per kWh (Slovenia, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.7 °C (2001 to 2025) |
| Cooling degree days | 176 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.47 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | Low (<10%) (Slovenia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is T2 Ljubljana Brnciceva to the power grid?
The nearest high-voltage substation in OpenStreetMap is RTP Žale (110 kV), about 3.8 km away.
How clean is the power for T2 Ljubljana Brnciceva?
The grid in Slovenia emits about 183 g CO₂ per kWh (2025). Largest sources: nuclear 39.3%, hydro 27.5%, coal 14.7%.
Who operates T2 Ljubljana Brnciceva?
T-2 d.o.o..
Data centers near Črnuče
- Telemach Tier3 DC 308 m
- Softnet Trzin DC 3.0 km
- DC Vojkova 58 4.0 km
- Telekom Slovenije - DC Cigaletova 5.6 km
- IT TEL Ljubljana 5.6 km
- SIX SI Jozef Stefan Institute 7.7 km
- SIX SI Ljubljana Technology Park 8.8 km
- Data center in Prevalje 59.1 km