T2 Ljubljana Brnciceva

T2 Ljubljana Brnciceva is an operational data center operated by T-2 d.o.o. in Črnuče, Slovenia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorT-2 d.o.o.
Networks1 networks
PeeringDB.
AddressBrnčičeva ulica 41A
Coordinates46.09496, 14.55381
Websitet-2.net/gostovanje-kolokacije

Power and grid

Nearest high-voltage substationRTP Žale, 110 kV, 3.8 km away (Elektro Ljubljana)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationRTP Beričevo, 400 kV, 4.6 km away
HV substations within 10 km3
Power plants within 50 km1.3 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity183 g CO₂ per kWh (Slovenia, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.3%, hydro 27.5%, coal 14.7%, solar 10.1%, gas 6.4%. Clean power: 78.9%
Industrial power priceEUR 0.130 per kWh (Slovenia, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.7 °C (2001 to 2025)
Cooling degree days176 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.47 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayLow (<10%) (Slovenia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is T2 Ljubljana Brnciceva to the power grid?

The nearest high-voltage substation in OpenStreetMap is RTP Žale (110 kV), about 3.8 km away.

How clean is the power for T2 Ljubljana Brnciceva?

The grid in Slovenia emits about 183 g CO₂ per kWh (2025). Largest sources: nuclear 39.3%, hydro 27.5%, coal 14.7%.

Who operates T2 Ljubljana Brnciceva?

T-2 d.o.o..

Data centers near Črnuče

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.