SIX SI Ljubljana Technology Park
SIX SI Ljubljana Technology Park is an operational data center operated by Arnes in Ljubljana, Slovenia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Arnes |
| Networks | 9 networks, 2 internet exchanges PeeringDB. |
| Address | Tehnološki park 18 |
| Coordinates | 46.04997, 14.46048 |
| Website | six.si/en/home |
Power and grid
| Nearest high-voltage substation | RTP Žale, 110 kV, 5.5 km away (Elektro Ljubljana) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | RTP Kleče, 220 kV, 6.2 km away |
| HV substations within 10 km | 2 |
| Power plants within 50 km | 216 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 183 g CO₂ per kWh (Slovenia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.3%, hydro 27.5%, coal 14.7%, solar 10.1%, gas 6.4%. Clean power: 78.9% |
| Industrial power price | EUR 0.130 per kWh (Slovenia, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.7 °C (2001 to 2025) |
| Cooling degree days | 176 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.47 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | Low (<10%) (Slovenia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is SIX SI Ljubljana Technology Park to the power grid?
The nearest high-voltage substation in OpenStreetMap is RTP Žale (110 kV), about 5.5 km away.
How clean is the power for SIX SI Ljubljana Technology Park?
The grid in Slovenia emits about 183 g CO₂ per kWh (2025). Largest sources: nuclear 39.3%, hydro 27.5%, coal 14.7%.
Who operates SIX SI Ljubljana Technology Park?
Arnes.
Data centers near Ljubljana
- SIX SI Jozef Stefan Institute 2.4 km
- IT TEL Ljubljana 3.6 km
- Telekom Slovenije - DC Cigaletova 3.7 km
- DC Vojkova 58 5.0 km
- T2 Ljubljana Brnciceva 8.8 km
- Telemach Tier3 DC 9.0 km
- Softnet Trzin DC 10.6 km
- Arctur 62.4 km
More Arnes data centers
- Gradbišče ARNES Slovenia
- SIX SI Jozef Stefan Institute Slovenia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.