Gradbišče ARNES
Gradbišče ARNES is an operational data center operated by ARNES in Maribor, Slovenia. Our footprint estimate of its power is about 2.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ARNES |
| Facility power | 2.5 MW (range 1.3 MW to 4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,094 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 46.56549, 15.60683 |
Power and grid
| Nearest high-voltage substation | RTP Pekre 110/35 kV, 110 kV, 1.5 km away (ELES) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | RTP Maribor, 400 kV, 8.3 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 2.6 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 183 g CO₂ per kWh (Slovenia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.3%, hydro 27.5%, coal 14.7%, solar 10.1%, gas 6.4%. Clean power: 78.9% |
| Industrial power price | EUR 0.130 per kWh (Slovenia, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 262 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.47 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Slovenia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Gradbišče ARNES use?
We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.
How close is Gradbišče ARNES to the power grid?
The nearest high-voltage substation in OpenStreetMap is RTP Pekre 110/35 kV (110 kV), about 1.5 km away.
How clean is the power for Gradbišče ARNES?
The grid in Slovenia emits about 183 g CO₂ per kWh (2025). Largest sources: nuclear 39.3%, hydro 27.5%, coal 14.7%.
Who operates Gradbišče ARNES?
ARNES.
Data centers near Maribor
- Posta Slovenije d.o.o. 3.0 km
- EuroHPC Vega 3.4 km · 0.2 MW
- Raiffeisen Rechenzentrum (Raaba) 52.2 km
- XINON Graz 54.2 km
- T-Mobile Rechenzentrum Graz 54.6 km · 3.5 MW
- Telekom-Tower 57.3 km · 6.6 MW
- DC North 65.8 km · 3.1 MW
- Kapsch BusinessCom earthDATAsafe 100.3 km
More ARNES data centers
- SIX SI Jozef Stefan Institute Slovenia
- SIX SI Ljubljana Technology Park Slovenia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.