Data Center Directory

Gradbišče ARNES

Gradbišče ARNES is an operational data center operated by ARNES in Maribor, Slovenia. Our footprint estimate of its power is about 2.5 MW.

Key facts

StatusOperational
OperatorARNES
Facility power2.5 MW (range 1.3 MW to 4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,094 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates46.56549, 15.60683

Power and grid

Nearest high-voltage substationRTP Pekre 110/35 kV, 110 kV, 1.5 km away (ELES)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationRTP Maribor, 400 kV, 8.3 km away
HV substations within 10 km3
Power plants within 50 km2.6 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity183 g CO₂ per kWh (Slovenia, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.3%, hydro 27.5%, coal 14.7%, solar 10.1%, gas 6.4%. Clean power: 78.9%
Industrial power priceEUR 0.130 per kWh (Slovenia, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.2 °C (2001 to 2025)
Cooling degree days262 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.47 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayLow (<10%) (Slovenia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Gradbišče ARNES use?

We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.

How close is Gradbišče ARNES to the power grid?

The nearest high-voltage substation in OpenStreetMap is RTP Pekre 110/35 kV (110 kV), about 1.5 km away.

How clean is the power for Gradbišče ARNES?

The grid in Slovenia emits about 183 g CO₂ per kWh (2025). Largest sources: nuclear 39.3%, hydro 27.5%, coal 14.7%.

Who operates Gradbišče ARNES?

ARNES.

Data centers near Maribor

More ARNES data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.