Telekom-Tower
Telekom-Tower is an operational data center operated by A1 / Telekom Austria in Graz, Austria. Our footprint estimate of its power is about 6.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | A1 / Telekom Austria |
| Facility power | 6.6 MW (range 3.3 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 912 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Ägydigasse 6, 8020, Graz |
| Coordinates | 47.06625, 15.43034 |
Power and grid
| Grid carbon intensity | 117 g CO₂ per kWh (Austria, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6% |
| Industrial power price | EUR 0.150 per kWh (Austria, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39 °C (2001 to 2025) |
| Cooling degree days | 267 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.24 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Low (<10%) (Austria) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telekom-Tower use?
We estimate the facility power at about 6.6 MW. Estimate from building footprint, low confidence.
How clean is the power for Telekom-Tower?
The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.
Who operates Telekom-Tower?
A1 / Telekom Austria.
Data centers near Graz
- T-Mobile Rechenzentrum Graz 2.9 km · 3.5 MW
- XINON Graz 3.7 km
- Raiffeisen Rechenzentrum (Raaba) 6.3 km
- Kapsch BusinessCom earthDATAsafe 43.1 km
- Gradbišče ARNES 57.3 km · 2.5 MW
- EuroHPC Vega 58.4 km · 0.2 MW
- Posta Slovenije d.o.o. 58.7 km
- Data center in Prevalje 68.1 km