Posta Slovenije d.o.o.
Posta Slovenije d.o.o. is an operational data center operated by Posta Slovenije d.o.o. in Maribor, Slovenia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Posta Slovenije d.o.o. |
| Networks | 1 networks PeeringDB. |
| Address | Slomskov trg 10 |
| Coordinates | 46.55879, 15.64426 |
| Website | posita.si |
Power and grid
| Nearest high-voltage substation | RTP Pekre 110/35 kV, 110 kV, 3.3 km away (ELES) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | RTP Maribor, 400 kV, 5.7 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 2.6 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 183 g CO₂ per kWh (Slovenia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.3%, hydro 27.5%, coal 14.7%, solar 10.1%, gas 6.4%. Clean power: 78.9% |
| Industrial power price | EUR 0.130 per kWh (Slovenia, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 262 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.47 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Slovenia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Posta Slovenije d.o.o. to the power grid?
The nearest high-voltage substation in OpenStreetMap is RTP Pekre 110/35 kV (110 kV), about 3.3 km away.
How clean is the power for Posta Slovenije d.o.o.?
The grid in Slovenia emits about 183 g CO₂ per kWh (2025). Largest sources: nuclear 39.3%, hydro 27.5%, coal 14.7%.
Who operates Posta Slovenije d.o.o.?
Posta Slovenije d.o.o..
Data centers near Maribor
- EuroHPC Vega 761 m · 0.2 MW
- Gradbišče ARNES 3.0 km · 2.5 MW
- Raiffeisen Rechenzentrum (Raaba) 53.5 km
- XINON Graz 55.6 km
- T-Mobile Rechenzentrum Graz 56.1 km · 3.5 MW
- Telekom-Tower 58.7 km · 6.6 MW
- DC North 62.9 km · 3.1 MW
- Kapsch BusinessCom earthDATAsafe 101.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.