Telin-1
Telin-1 is an operational data center operated by Telekomunikasi Indonesia International in Singapore, Singapore. Our footprint estimate of its power is about 6.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Telekomunikasi Indonesia International |
| Facility power | 6.8 MW (range 3.4 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,842 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Address | 30 Changi North Way |
| Coordinates | 1.35303, 103.97486 |
| Website | telin.sg |
Power and grid
| Nearest high-voltage substation | Tampines Wafer Substation 230kV, 230 kV, 5.5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 19 GW in 39 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 497 g CO₂ per kWh (Singapore, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 91.1%, bioenergy 2.8%, solar 2.7%, oil and other fossil 2.5%, coal 0.9%. Clean power: 5.5% |
Climate and water
| Average temperature | 27.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.9 °C (2001 to 2025) |
| Cooling degree days | 3,296 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.82 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | NoData (Singapore) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telin-1 use?
We estimate the facility power at about 6.8 MW. Estimate from building footprint, low confidence.
How close is Telin-1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Tampines Wafer Substation 230kV (230 kV), about 5.5 km away.
How clean is the power for Telin-1?
The grid in Singapore emits about 497 g CO₂ per kWh (2025). Largest sources: gas 91.1%, bioenergy 2.8%, solar 2.7%.
Who operates Telin-1?
Telekomunikasi Indonesia International.
Data centers near Singapore
- OCBC data center in Singapore 2.1 km · 28 MW
- Digital Realty Singapore SIN11 2.1 km · 75 MW
- Digital Realty Singapore SIN12 2.2 km
- STTGDC SIN6 2.4 km · 1.8 MW
- Amazon Web Services data center in Loyang 2.6 km · 2 MW
- Starhub Data Center @ Loyang 2.6 km
- AirTrunk SGP1 2.8 km · 2.6 MW
- AirTrunk Singapore SGP1 2.8 km · 90 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.