Thales is an operational data center operated by Thales in Doncaster, United Kingdom. Our footprint estimate of its power is about 7.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Thales |
| Facility power | 7.8 MW (range 3.9 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,243 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Wisconsin Drive, Doncaster |
| Coordinates | 53.50427, -1.11202 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Thales use?
We estimate the facility power at about 7.8 MW. Estimate from building footprint, low confidence.
How clean is the power for Thales?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Thales?
Thales.
Data centers near Doncaster
- Pulsant Rotherham YH-1 13.4 km
- ASK4 DC1 - Sheffield 24.0 km
- HA Hosting DC1 24.3 km
- HSBC Data Centre 25.2 km · 13 MW
- Hive IT 28.2 km
- HSBC Wakefield Data Centre 28.2 km · 17 MW
- UoS IT Services 28.3 km
- nLighten Leeds LBA1 28.7 km · 5.7 MW
More Thales data centers