The UK Grid Network LTD (Greenheys DC)
The UK Grid Network LTD (Greenheys DC) is an operational data center operated by The UK Grid Network in Manchester, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | The UK Grid Network |
| Networks | 1 networks PeeringDB. |
| Address | Greenheys, Manchester Science Park, Pencroft Way |
| Coordinates | 53.46312, -2.23854 |
| Website | ukgrid.net/greenheys_data_centre.shtml |
Power and grid
| Nearest high-voltage substation | Bloom Street Substation, 132 kV, 1.4 km away (Electricity North West) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | South Manchester Substation, 275 kV, 5.3 km away |
| HV substations within 10 km | 15 |
| Power plants within 50 km | 3.3 GW in 78 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 8.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.7 °C (2001 to 2025) |
| Cooling degree days | 7 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.73 kWh per m² per day |
| Wind at 50 m | 7.3 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is The UK Grid Network LTD (Greenheys DC) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Bloom Street Substation (132 kV), about 1.4 km away.
How clean is the power for The UK Grid Network LTD (Greenheys DC)?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates The UK Grid Network LTD (Greenheys DC)?
The UK Grid Network.
Data centers near Manchester
- Equinix MA1 - Manchester, Williams/Kilburn 110 m
- Equinix MA4 - Manchester, Synergy House 182 m
- Greenheys 282 m
- iomart DC6 Turing House 532 m
- Volta Manchester 618 m · 3.9 MW
- Asanti Manchester 1.8 km
- Joule House 3.7 km · 4.5 MW
- LDeX2 3.7 km
Sources
Correct this page or get the data