Joule House

Joule House is an operational data center operated by Equinix in Old Trafford, United Kingdom. Our footprint estimate of its power is about 4.5 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power4.5 MW (range 2.2 MW to 7.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,709 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressTrafford Wharf Road 76, M17 1HE
Coordinates53.46802, -2.29342
Websiteequinix.co.uk/locations/europe-colocation/united-kingdom-colocation/manchester-data-centers/ma3

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 1.8 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSouth Manchester Substation, 275 kV, 5.3 km away
HV substations within 10 km20
Power plants within 50 km3.5 GW in 84 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature28 °C (2001 to 2025)
Cooling degree days7 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.75 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Joule House use?

We estimate the facility power at about 4.5 MW. Estimate from building footprint, low confidence.

How close is Joule House to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 1.8 km away.

How clean is the power for Joule House?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Joule House?

Equinix.

Data centers near Old Trafford

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.