Data Center Directory

TPx Colocation Datacenter

TPx Colocation Datacenter is an operational data center operated by TPx Communications in Santa Ana, United States. Our footprint estimate of its power is about 6.4 MW.

Key facts

StatusOperational
OperatorTPx Communications
Facility power6.4 MW (range 3.2 MW to 10 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,349 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressEast Dyer Road 2001, 92705, Santa Ana
Coordinates33.70751, -117.84410

Power and grid

Nearest high-voltage substationJohanna Substation, 220 kV, 1 km away (Southern California Edison)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km3
UtilitySouthern California Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityCISO
Nearest gas pipelineSouthern California Gas Co, intrastate pipeline, 8.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km8.3 GW in 89 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity189 g CO₂ per kWh (California, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7%
Industrial power priceUSD 0.241 per kWh (California, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature17.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.7 °C (2001 to 2025)
Cooling degree days338 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.42 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayExtremely High (>80%) (California)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does TPx Colocation Datacenter use?

We estimate the facility power at about 6.4 MW. Estimate from building footprint, low confidence.

How close is TPx Colocation Datacenter to the power grid?

The nearest high-voltage substation in OpenStreetMap is Johanna Substation (220 kV), about 1 km away. The local utility is Southern California Edison Co, in the CISO balancing area.

How clean is the power for TPx Colocation Datacenter?

The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.

Who operates TPx Colocation Datacenter?

TPx Communications.

Data centers near Santa Ana

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.