OCDC Orange County Datacenter Santa Ana
OCDC Orange County Datacenter Santa Ana is an operational data center operated by VPLS in Santa Ana, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | VPLS |
| Address | 1400 S. Grand |
| Coordinates | 33.72987, -117.85178 |
| Website | govportals.com |
Power and grid
| Nearest high-voltage substation | Johanna Substation, 220 kV, 1.8 km away (Southern California Edison) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Utility | Southern California Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | CISO |
| Nearest gas pipeline | Southern California Gas Co, intrastate pipeline, 5.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 8.5 GW in 94 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 17.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.7 °C (2001 to 2025) |
| Cooling degree days | 338 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.42 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is OCDC Orange County Datacenter Santa Ana to the power grid?
The nearest high-voltage substation in OpenStreetMap is Johanna Substation (220 kV), about 1.8 km away. The local utility is Southern California Edison Co, in the CISO balancing area.
How clean is the power for OCDC Orange County Datacenter Santa Ana?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates OCDC Orange County Datacenter Santa Ana?
VPLS.
Data centers near Santa Ana
- TPx Colocation Datacenter 2.6 km · 6.4 MW
- Xo Communications Colocation Data Center 2.9 km · 2.1 MW
- Lumen Technologies 4.5 km · 15 MW
- DataBank Irvine (SNA1) 4.5 km
- IC2NET Data Center 4.7 km
- Centersquare Los Angeles (LAX3) 4.7 km
- DataBank Irvine (SNA2) 4.7 km
- Centersquare Los Angeles (LAX5) 5.2 km
More VPLS data centers
- Evocative EWR1 United States
- Evocative DA4 United States
- Evocative SJC11 United States
- Evocative Virginia (VA1) United States
- Evocative SJC3 United States
- Evocative BOS1 United States
- Evocative DAL6 United States
- Evocative Emeryville (EM1) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.