Transworld CLS

Transworld CLS is an operational data center operated by Trans World Associates (Pvt.) in Karachi, Pakistan. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorTrans World Associates (Pvt.)
Networks3 networks
PeeringDB.
AddressC10-19 Goth Mubarik Rd, Sector 54 Hawkes Bay Town, Goth Lashkari
Coordinates24.87524, 66.83315
Websitetw1.com

Power and grid

Grid carbon intensity309 g CO₂ per kWh (Pakistan, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 23.1%, gas 23%, solar 21.2%, coal 14.5%, nuclear 14.1%. Clean power: 60.9%

Climate and water

Average temperature26.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days3,084 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.66 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayHigh (40-80%) (Pakistan)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for Transworld CLS?

The grid in Pakistan emits about 309 g CO₂ per kWh (2025). Largest sources: hydro 23.1%, gas 23%, solar 21.2%.

Who operates Transworld CLS?

Trans World Associates (Pvt.).