Data Center Directory

TWL-KOM Datacenter II

TWL-KOM Datacenter II is an operational data center operated by TWL-KOM in Ludwigshafen am Rhein, Germany. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorTWL-KOM
Networks1 networks
PeeringDB.
AddressIndustriestrasse 2
Coordinates49.48649, 8.42006
Websitetwl-kom.de/datacenter

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 3 km away (Umspannwerk Oppau)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationBASF, 220 kV, 4.7 km away
HV substations within 10 km18
Power plants within 50 km3.7 GW in 37 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.5 °C (2001 to 2025)
Cooling degree days213 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.17 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayLow (<10%) (Rheinland-Pfalz)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is TWL-KOM Datacenter II to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 3 km away.

How clean is the power for TWL-KOM Datacenter II?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates TWL-KOM Datacenter II?

TWL-KOM.

Data centers near Ludwigshafen am Rhein

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.