TYO3 Tokyo Data Center
TYO3 Tokyo Data Center is an operational data center operated by Digital Edge in Tokyo, Japan. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Edge |
| Facility power | 1.5 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,217 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.69784, 139.70576 |
| Website | digitaledgedc.com/products-services/data-centers/japan/#TYO3 |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 13.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.5 °C (2001 to 2025) |
| Cooling degree days | 700 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.89 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Medium - High (20-40%) (Tokyo) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TYO3 Tokyo Data Center use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
How clean is the power for TYO3 Tokyo Data Center?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates TYO3 Tokyo Data Center?
Digital Edge.
Data centers near Tokyo
- Digital Edge TYO3 (ComSpace 2) - Tokyo 750 m
- NTT Docomo 1.5 km
- AIST ABCI 3.0 1.6 km · 8.6 MW
- Digital Edge TYO1 (MDC) - Tokyo 2.7 km
- Equinix TY10 - Tokyo 3.7 km
- NTT ME Ikebukuro DC 3.9 km
- KDDI 4.1 km
- University of Tokyo Wisteria/BDEC-01 (Aquarius) 4.1 km · 0.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.