TYO3 Tokyo Data Center

TYO3 Tokyo Data Center is an operational data center operated by Digital Edge in Tokyo, Japan. Our footprint estimate of its power is about 1.5 MW.

Key facts

StatusOperational
OperatorDigital Edge
Facility power1.5 MW (range 0.7 MW to 2.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,217 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 640 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates35.69784, 139.70576
Websitedigitaledgedc.com/products-services/data-centers/japan/#TYO3

Power and grid

Grid carbon intensity474 g CO₂ per kWh (Japan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33%

Climate and water

Average temperature13.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.5 °C (2001 to 2025)
Cooling degree days700 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.89 kWh per m² per day
Wind at 50 m5.4 m/s average
Water stress todayMedium - High (20-40%) (Tokyo)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does TYO3 Tokyo Data Center use?

We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.

How clean is the power for TYO3 Tokyo Data Center?

The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.

Who operates TYO3 Tokyo Data Center?

Digital Edge.