AIST ABCI 3.0

AIST ABCI 3.0 is an operational AI data center operated by National Institute of Advanced Industrial Science and Technology (AIST) in Tokyo, Japan. Its power is about 8.6 MW. Epoch AI estimates about 6,128 H100-equivalent AI chips (NVIDIA Tesla V100 SXM2, NVIDIA A100 SXM4 40 GB, NVIDIA H200 SXM).

Key facts

StatusOperational
OperatorNational Institute of Advanced Industrial Science and Technology (AIST)
Facility power8.6 MW
Reported (Epoch AI or owner data)
AI compute6,128 H100-equivalents
AI chipsNVIDIA Tesla V100 SXM2, NVIDIA A100 SXM4 40 GB, NVIDIA H200 SXM
Reported (Epoch AI or owner data)
Chip count6,128
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 3,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressKashiwa Campus, The University of Tokyo Japan, 〒277-0882 Chiba, Kashiwa, Kashiwanoha, 5 Chome−1−5
Coordinates35.68882, 139.69253

Power and grid

Nearest high-voltage substation新宿変電所, 275 kV, 400 m away (東京電力パワーグリッド)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km17
Power plants within 50 km35 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity474 g CO₂ per kWh (Japan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33%

Climate and water

Average temperature13.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.5 °C (2001 to 2025)
Cooling degree days700 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.89 kWh per m² per day
Wind at 50 m5.4 m/s average
Water stress todayMedium - High (20-40%) (Tokyo)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
AIST ABCI 1.0NVIDIA Tesla V100 SXM24,3523 MW2018-06-01
AIST ABCI 2.0NVIDIA A100 SXM4 40 GB + NVIDIA Tesla V100 SXM25,3122.8 MW2021-05-30
AIST ABCI 3.0NVIDIA H200 SXM6,1288.6 MW2025-01-20

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does AIST ABCI 3.0 use?

Public data puts the facility power at about 8.6 MW. Reported (Epoch AI or owner data).

What chips does AIST ABCI 3.0 use?

Reported chips: NVIDIA Tesla V100 SXM2, NVIDIA A100 SXM4 40 GB, NVIDIA H200 SXM.

How close is AIST ABCI 3.0 to the power grid?

The nearest high-voltage substation in OpenStreetMap is 新宿変電所 (275 kV), about 400 m away.

How clean is the power for AIST ABCI 3.0?

The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.

Who operates AIST ABCI 3.0?

National Institute of Advanced Industrial Science and Technology (AIST).

Data centers near Tokyo

More National Institute of Advanced Industrial Science and Technology (AIST) data centers