AIST ABCI 3.0
AIST ABCI 3.0 is an operational AI data center operated by National Institute of Advanced Industrial Science and Technology (AIST) in Tokyo, Japan. Its power is about 8.6 MW. Epoch AI estimates about 6,128 H100-equivalent AI chips (NVIDIA Tesla V100 SXM2, NVIDIA A100 SXM4 40 GB, NVIDIA H200 SXM).
Key facts
| Status | Operational |
|---|---|
| Operator | National Institute of Advanced Industrial Science and Technology (AIST) |
| Facility power | 8.6 MW Reported (Epoch AI or owner data) |
| AI compute | 6,128 H100-equivalents |
| AI chips | NVIDIA Tesla V100 SXM2, NVIDIA A100 SXM4 40 GB, NVIDIA H200 SXM Reported (Epoch AI or owner data) |
| Chip count | 6,128 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 3,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Kashiwa Campus, The University of Tokyo Japan, 〒277-0882 Chiba, Kashiwa, Kashiwanoha, 5 Chome−1−5 |
| Coordinates | 35.68882, 139.69253 |
Power and grid
| Nearest high-voltage substation | 新宿変電所, 275 kV, 400 m away (東京電力パワーグリッド) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 17 |
| Power plants within 50 km | 35 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 13.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.5 °C (2001 to 2025) |
| Cooling degree days | 700 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.89 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Medium - High (20-40%) (Tokyo) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| AIST ABCI 1.0 | NVIDIA Tesla V100 SXM2 | 4,352 | 3 MW | 2018-06-01 |
| AIST ABCI 2.0 | NVIDIA A100 SXM4 40 GB + NVIDIA Tesla V100 SXM2 | 5,312 | 2.8 MW | 2021-05-30 |
| AIST ABCI 3.0 | NVIDIA H200 SXM | 6,128 | 8.6 MW | 2025-01-20 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AIST ABCI 3.0 use?
Public data puts the facility power at about 8.6 MW. Reported (Epoch AI or owner data).
What chips does AIST ABCI 3.0 use?
Reported chips: NVIDIA Tesla V100 SXM2, NVIDIA A100 SXM4 40 GB, NVIDIA H200 SXM.
How close is AIST ABCI 3.0 to the power grid?
The nearest high-voltage substation in OpenStreetMap is 新宿変電所 (275 kV), about 400 m away.
How clean is the power for AIST ABCI 3.0?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates AIST ABCI 3.0?
National Institute of Advanced Industrial Science and Technology (AIST).
Data centers near Tokyo
- NTT Docomo 1.1 km
- Digital Edge TYO3 (ComSpace 2) - Tokyo 1.5 km
- TYO3 Tokyo Data Center 1.6 km · 1.5 MW
- Broadband Tower - Shibuya Datacenter Bldg. 3.9 km
- Digital Edge TYO1 (MDC) - Tokyo 4.3 km
- Equinix TY10 - Tokyo 5.1 km
- NTT ME Ikebukuro DC 5.3 km
- KDDI 5.4 km
More National Institute of Advanced Industrial Science and Technology (AIST) data centers
- AIST ABCI-Q Japan
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.