AIST ABCI-Q
AIST ABCI-Q is an operational AI data center operated by National Institute of Advanced Industrial Science and Technology (AIST) in Tsukuba, Japan. Its power is about 2.9 MW. Epoch AI estimates about 2,048 H100-equivalent AI chips (NVIDIA V100, NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | National Institute of Advanced Industrial Science and Technology (AIST) |
| Facility power | 2.9 MW Reported (Epoch AI or owner data) |
| AI compute | 2,048 H100-equivalents |
| AI chips | NVIDIA V100, NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 2,048 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | AIST Tsukuba 1 Chome Higashi, Tsukuba, Ibaraki 305-0046, Japan |
| Coordinates | 36.08322, 140.07755 |
Power and grid
| Nearest high-voltage substation | 東光台変電所, 154 kV, 1.3 km away (東京電力パワーグリッド) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 常総変電所, 275 kV, 7.8 km away |
| HV substations within 10 km | 5 |
| Power plants within 50 km | 1.4 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 14.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.8 °C (2001 to 2025) |
| Cooling degree days | 878 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.84 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Medium - High (20-40%) (Ibaraki) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| University of Tsukuba Cygnus | NVIDIA V100 | 320 | 0.2 MW | 2019-04-30 |
| AIST ABCI-Q | NVIDIA H100 SXM5 80GB | 2,048 | 2.9 MW | 2025-06-15 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AIST ABCI-Q use?
Public data puts the facility power at about 2.9 MW. Reported (Epoch AI or owner data).
What chips does AIST ABCI-Q use?
Reported chips: NVIDIA V100, NVIDIA H100 SXM5 80GB.
How close is AIST ABCI-Q to the power grid?
The nearest high-voltage substation in OpenStreetMap is 東光台変電所 (154 kV), about 1.3 km away.
How clean is the power for AIST ABCI-Q?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates AIST ABCI-Q?
National Institute of Advanced Industrial Science and Technology (AIST).
Data centers near Tsukuba
- Google 印西データセンター 29.9 km · 41 MW
- STTGDC TYO1 30.0 km
- MCデジタル・リアルティ NRT10 30.6 km · 76 MW
- Digital Realty Tokyo - NRT14 30.8 km · 20 MW
- Data center in Shiroi 30.9 km · 3.7 MW
- Data center in 印西市 30.9 km · 18 MW
- MCデジタル・リアルティ NRT12 30.9 km · 8.5 MW
- Equinix 31.0 km · 3.9 MW
More National Institute of Advanced Industrial Science and Technology (AIST) data centers
- AIST ABCI 3.0 Japan
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.