Data Center Directory

STTGDC TYO1

STTGDC TYO1 is an operational data center operated by STTGDC in Inzai, Japan. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorSTTGDC
Also known asSTTGDC TYO2
Address2-5, 2-8, 2-9 Kaguro-Minami 2 Chome, Inzai-shi, Chiba Prefecture, Japan
Coordinates35.81758, 140.13426
Websitesttgdc.com/jp-en

Power and grid

Grid carbon intensity474 g CO₂ per kWh (Japan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33%

Climate and water

Average temperature14.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.8 °C (2001 to 2025)
Cooling degree days878 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.84 kWh per m² per day
Wind at 50 m5.5 m/s average
Water stress todayMedium - High (20-40%) (Chiba)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for STTGDC TYO1?

The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.

Who operates STTGDC TYO1?

STTGDC.

Data centers near Inzai

More STTGDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.