Data Center Directory

Equinix

Equinix is an operational data center operated by Equinix in Inzai, Japan. Our footprint estimate of its power is about 3.9 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power3.9 MW (range 1.9 MW to 6.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,212 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates35.80696, 140.12621

Power and grid

Grid carbon intensity474 g CO₂ per kWh (Japan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33%

Climate and water

Average temperature14.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.8 °C (2001 to 2025)
Cooling degree days878 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.84 kWh per m² per day
Wind at 50 m5.5 m/s average
Water stress todayMedium - High (20-40%) (Chiba)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix use?

We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.

How clean is the power for Equinix?

The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.

Who operates Equinix?

Equinix.

Data centers near Inzai

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.