MCデジタル・リアルティ NRT10
MCデジタル・リアルティ NRT10 is an operational data center operated by MCデジタル・リアルティ in Inzai, Japan. Our footprint estimate of its power is about 76 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | MCデジタル・リアルティ |
| Facility power | 76 MW (range 38 MW to 122 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,605 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 32,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | 三菱総研DCS |
| Coordinates | 35.81000, 140.12145 |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 14.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.8 °C (2001 to 2025) |
| Cooling degree days | 878 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.84 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Medium - High (20-40%) (Chiba) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does MCデジタル・リアルティ NRT10 use?
We estimate the facility power at about 76 MW. Estimate from building footprint, low confidence.
How clean is the power for MCデジタル・リアルティ NRT10?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates MCデジタル・リアルティ NRT10?
MCデジタル・リアルティ.
Data centers near Inzai
- Data center in 印西市 251 m · 18 MW
- Digital Realty Tokyo - NRT14 270 m · 20 MW
- MCデジタル・リアルティ NRT12 382 m · 8.5 MW
- Data center in Shiroi 507 m · 3.7 MW
- Equinix 547 m · 3.9 MW
- Google 印西データセンター 1.4 km · 41 MW
- STTGDC TYO1 1.4 km
- IIJ Shiroi DCC 1.8 km
More MCデジタル・リアルティ data centers
- MCデジタル・リアルティ NRT12 Japan
Sources
Correct this page or get the data