IIJ Shiroi DCC
IIJ Shiroi DCC is an operational data center operated by Internet Initiative Japan in Shiroi-shi, Japan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Internet Initiative Japan |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Address | Sakuradai |
| Coordinates | 35.80050, 140.10469 |
| Website | iij.ad.jp/en/biz/dc |
Power and grid
| Nearest high-voltage substation | 千葉ニュータウン変電所, 154 kV, 2.4 km away (東京電力パワーグリッド) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 新京葉変電所, 500 kV, 3.8 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 23 GW in 33 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 14.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.8 °C (2001 to 2025) |
| Cooling degree days | 878 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.84 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Medium - High (20-40%) (Chiba) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is IIJ Shiroi DCC to the power grid?
The nearest high-voltage substation in OpenStreetMap is 千葉ニュータウン変電所 (154 kV), about 2.4 km away.
How clean is the power for IIJ Shiroi DCC?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates IIJ Shiroi DCC?
Internet Initiative Japan.
Data centers near Shiroi-shi
- Data center in Shiroi 1.3 km · 3.7 MW
- MCデジタル・リアルティ NRT12 1.5 km · 8.5 MW
- Digital Realty Tokyo - NRT14 1.6 km · 20 MW
- Data center in 印西市 1.7 km · 18 MW
- MCデジタル・リアルティ NRT10 1.8 km · 76 MW
- Equinix 2.1 km · 3.9 MW
- Google 印西データセンター 3.2 km · 41 MW
- STTGDC TYO1 3.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.