Data center in 印西市

Data center in 印西市 is an operational data center in 印西市, Japan. Our footprint estimate of its power is about 18 MW.

Key facts

StatusOperational
Facility power18 MW (range 8.9 MW to 28 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,963 m² building outline x 5 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Address270-1352, 印西市
Coordinates35.80775, 140.12164

Satellite view

Questions

How much power does Data center in 印西市 use?

We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.