Verizon Warrington

Verizon Warrington is an operational data center operated by Verizion in Warrington, United Kingdom. Our footprint estimate of its power is about 2 MW.

Key facts

StatusOperational
OperatorVerizion
Facility power2 MW (range 1 MW to 3.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,705 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 850 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCalver Road 9, WA2 8UD, Warrington
Coordinates53.42053, -2.60137

Power and grid

Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature28 °C (2001 to 2025)
Cooling degree days7 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.75 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Verizon Warrington use?

We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.

How clean is the power for Verizon Warrington?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Verizon Warrington?

Verizion.