Iron Mountain is an operational data center in Warrington, United Kingdom. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 12 MW (range 6 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,953 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Europa Boulevard 1010, WA5 7YP, Warrington |
| Coordinates | 53.41486, -2.62976 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 28 °C (2001 to 2025) |
| Cooling degree days | 7 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.75 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Iron Mountain use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How clean is the power for Iron Mountain?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near Warrington
- Verizon Warrington 2.0 km · 2 MW
- Data center in Ashton in Makerfield 6.7 km · 22 MW
- Getronics, The Babbage Centre 12.1 km
- The Babbage Centre 12.4 km · 4 MW
- Data center in Urmston 17.6 km
- Bolton Customer Hosting Centre 20.1 km
- ARO DC2 Kilby House (AIMES) 20.1 km
- ANS - MAN4 20.7 km
Sources