Bolton Customer Hosting Centre
Bolton Customer Hosting Centre is an operational data center operated by Imerja in Bolton, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Imerja |
| Networks | 1 networks PeeringDB. |
| Address | Hallmark House, Paragon Business Park, Chorley New Road |
| Coordinates | 53.58508, -2.52622 |
| Website | intercity.technology |
Power and grid
| Nearest high-voltage substation | Westhoughton Substation, 132 kV, 3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Kearsley Substation, 400 kV, 12.3 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 3.8 GW in 88 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 28 °C (2001 to 2025) |
| Cooling degree days | 7 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.75 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Bolton Customer Hosting Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Westhoughton Substation (132 kV), about 3 km away.
How clean is the power for Bolton Customer Hosting Centre?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Bolton Customer Hosting Centre?
Imerja.
Data centers near Bolton
- Data center in Ashton in Makerfield 14.3 km · 22 MW
- Evolution @ Agecroft Commerce Park 17.0 km · 19 MW
- Evolution @ Agecroft Commerce Park 17.1 km · 13 MW
- Equinix MA5 - Manchester 17.6 km
- Data center in Urmston 18.2 km
- AtlasEdge DC Manchester MAN001 18.7 km
- Verizon Warrington 19.0 km · 2 MW
- ANS - MAN4 19.1 km
More Imerja data centers
- Elstree Customer Hosting Centre United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.