Data Center Directory

Elstree Customer Hosting Centre

Elstree Customer Hosting Centre is an operational data center operated by Imerja in Borehamwood, United Kingdom. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorImerja
AddressRegent House, Theobald Street
Coordinates51.65399, -0.28001
Websiteintercity.technology

Power and grid

Nearest high-voltage substationEdgware Cable Compound, 275 kV, 2.3 km away (National Grid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km18
Power plants within 50 km3.1 GW in 107 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.9 °C (2001 to 2025)
Cooling degree days53 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Elstree Customer Hosting Centre to the power grid?

The nearest high-voltage substation in OpenStreetMap is Edgware Cable Compound (275 kV), about 2.3 km away.

How clean is the power for Elstree Customer Hosting Centre?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Elstree Customer Hosting Centre?

Imerja.

Data centers near Borehamwood

More Imerja data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.