Pure DC London Brent Cross
Pure DC London Brent Cross is an operational data center operated by Pure DC in Cricklewood, United Kingdom. Our footprint estimate of its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Pure DC |
| Facility power | 18 MW (range 8.8 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,682 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.57062, -0.23719 |
Power and grid
| Nearest high-voltage substation | Neasden Feeder Station, 132 kV, 2 km away (London Underground) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Willesden Substation, 400 kV, 4.3 km away |
| HV substations within 10 km | 37 |
| Power plants within 50 km | 3.3 GW in 103 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Pure DC London Brent Cross use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
How close is Pure DC London Brent Cross to the power grid?
The nearest high-voltage substation in OpenStreetMap is Neasden Feeder Station (132 kV), about 2 km away.
How clean is the power for Pure DC London Brent Cross?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Pure DC London Brent Cross?
Pure DC.
Data centers near Cricklewood
- LDeX 1 515 m · 3.2 MW
- LDeX1 521 m
- Options IT - Park Royal Datacenter (PRDC) 4.3 km · 1.2 MW
- Vantage LHR2 4.5 km · 5.2 MW
- Colt London West 4.5 km · 6 MW
- Equinix LD9 - London, Powergate 4.7 km · 16 MW
- Data center in Harlesden 4.9 km · 23 MW
- Vantage Data Centers LHR1 4.9 km · 9.3 MW
More Pure DC data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.