Options IT - Park Royal Datacenter (PRDC)

Options IT - Park Royal Datacenter (PRDC) is an operational data center operated by Options Technology in London, United Kingdom. Our footprint estimate of its power is about 1.2 MW.

Key facts

StatusOperational
OperatorOptions Technology
Facility power1.2 MW (range 0.6 MW to 1.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,013 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 510 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks4 networks
PeeringDB.
Also known asOptions Park Royal Data Centre
Address3 Waxlow Road, Park Royal
Coordinates51.53477, -0.26086
Websiteoptions-it.com

Power and grid

Nearest high-voltage substationWillesden Substation, 400 kV, 200 m away (National Grid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km34
Power plants within 50 km3.1 GW in 98 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.9 °C (2001 to 2025)
Cooling degree days53 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Options IT - Park Royal Datacenter (PRDC) use?

We estimate the facility power at about 1.2 MW. Estimate from building footprint, low confidence.

How close is Options IT - Park Royal Datacenter (PRDC) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Willesden Substation (400 kV), about 200 m away.

How clean is the power for Options IT - Park Royal Datacenter (PRDC)?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Options IT - Park Royal Datacenter (PRDC)?

Options Technology.