Equinix LD9 - London, Powergate
Equinix LD9 - London, Powergate is an operational data center operated by Equinix in London, United Kingdom. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 16 MW (range 8.2 MW to 26 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,718 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 32 networks, 4 internet exchanges PeeringDB. |
| Also known as | COLT DC London II · Equinix LD9 |
| Address | Unit 1, Powergate Business Park, Volt Avenue |
| Coordinates | 51.53055, -0.25743 |
| Website | equinix.com/locations |
Power and grid
| Nearest high-voltage substation | Willesden Substation, 400 kV, 400 m away (National Grid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 34 |
| Power plants within 50 km | 3.1 GW in 97 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix LD9 - London, Powergate use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
How close is Equinix LD9 - London, Powergate to the power grid?
The nearest high-voltage substation in OpenStreetMap is Willesden Substation (400 kV), about 400 m away.
How clean is the power for Equinix LD9 - London, Powergate?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Equinix LD9 - London, Powergate?
Equinix.
Data centers near London
- Colt London West 155 m · 6 MW
- Data center in Harlesden 217 m · 23 MW
- Vantage LHR2 297 m · 5.2 MW
- Vantage Data Centers LHR1 356 m · 9.3 MW
- Options IT - Park Royal Datacenter (PRDC) 526 m · 1.2 MW
- Data center in Acton 1.2 km · 6.2 MW
- Equinix LD3 - London, Park Royal 1.4 km · 4.1 MW
- Redwire 4.1 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States