Vantage LHR2

Vantage LHR2 is an operational data center in Harlesden, United Kingdom. Our footprint estimate of its power is about 5.2 MW.

Key facts

StatusOperational
Facility power5.2 MW (range 2.6 MW to 8.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,312 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.53297, -0.25923

Power and grid

Nearest high-voltage substationUnnamed substation, 400 kV, 100 m away (National Grid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km34
Power plants within 50 km3.1 GW in 97 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.9 °C (2001 to 2025)
Cooling degree days53 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Vantage LHR2 use?

We estimate the facility power at about 5.2 MW. Estimate from building footprint, low confidence.

How close is Vantage LHR2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (400 kV), about 100 m away.

How clean is the power for Vantage LHR2?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.