Data Center Directory

Pure DC Madrid Meco (MAD01)

Pure DC Madrid Meco (MAD01) is a data center under construction operated by Pure DC in Meco, Spain. Our footprint estimate of its power is about 4.5 MW.

Key facts

StatusUnder construction
OperatorPure DC
Facility power4.5 MW (range 1.8 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 37,154 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.53204, -3.31298

Power and grid

Nearest high-voltage substationSubestación de Meco, 220 kV, 1 km away (Red Eléctrica de España;Iberdrola)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km10
Power plants within 50 km827 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity154 g CO₂ per kWh (Spain, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6%
Industrial power priceEUR 0.105 per kWh (Spain, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature13.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.9 °C (2001 to 2025)
Cooling degree days623 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.7 kWh per m² per day
Wind at 50 m5.1 m/s average
Water stress todayHigh (40-80%) (Spain)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Pure DC Madrid Meco (MAD01) use?

We estimate the facility power at about 4.5 MW. Estimate from building footprint, low confidence.

How close is Pure DC Madrid Meco (MAD01) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación de Meco (220 kV), about 1 km away.

How clean is the power for Pure DC Madrid Meco (MAD01)?

The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.

Who operates Pure DC Madrid Meco (MAD01)?

Pure DC.

Data centers near Meco

More Pure DC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.